 |
|
SECONDARY SCHOOL (London)
Specialist Technology College1600 pupils. 11-18 co-educational
Project Management Led, Full Architectural Service |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Providing new Science Laboratories (shown), Prep’ Rooms and a New Art Block on a precarious and shifting slope proved a great challenge but the project was, as always, delivered on time and within budget.
We have delivered a number of other projects on this unusual school site since 1995 and these have included:
New Business Centre
New Media Studies Block
New and refurbished Music Room and individual Music Practice Studios
New Playground
Refurbishment and Reconfiguration of Entrance Areas
Roof Repairs
Bridge Improvement to a Bridge-Link between department
Music Rooms and Practice Rooms
Numerous alteration and refurbishment projects throughout the school
General support with Master Planning |
|
|